Model Railway Forum

Go Back   Model Railway Forum > Model Railway Construction > Members layouts

Members layouts Dedicated area to show the community your model railway projects


Reply
 
Thread Tools Display Modes
Old 15-03-2018, 08:34 AM   #21
davey
Member
 
davey's Avatar
 

Join Date: Jan 2018
Posts: 32
davey is on a distinguished road
Default

Very impressive.
davey is offline   Reply With Quote
Old 20-03-2018, 03:36 PM   #22
RSR Engineer
Artur Gorote
 
RSR Engineer's Avatar
 

Join Date: Jan 2017
Location: Thannhausen, Germany
Posts: 35
RSR Engineer is on a distinguished road
Default Nearly done

The mainframe itself is now complete and just needs to be set up on the rest of its legs. The assembly work has, as predicted, progressed quite quickly, although a dose of flu had me out of action for a week. Working in shifts of perhaps 3 hours a day, I'd estimate the total effort at some thirty hours. Can't wait to start on the boards.
Cheers
Artur
The work is documented in somewhat more detail on flickr:
https://www.flickr.com/photos/537755...57693670264075
Attached Images
File Type: jpg NL014x.jpg (237.9 KB, 31 views)
File Type: jpg NL016x.jpg (281.7 KB, 38 views)
File Type: jpg option11-01d20-mainframe.jpg (145.5 KB, 19 views)

Last edited by RSR Engineer; 20-03-2018 at 03:39 PM. Reason: URL
RSR Engineer is offline   Reply With Quote
Old 20-03-2018, 03:43 PM   #23
Walkingthedog
Part time idiot
 
Walkingthedog's Avatar
 

Join Date: Aug 2013
Location: HAZLEMERE, Bucks
Posts: 10,046
Walkingthedog is on a distinguished road
Default

Wow, are you going to run real trains on it.
__________________
NURSE,the screens!
Walkingthedog is online now   Reply With Quote
Old 20-03-2018, 05:05 PM   #24
mijj
Junior Member
 

Join Date: Oct 2016
Location: East Sussex
Posts: 567
mijj is on a distinguished road
Default

It is very impressive, what a lot of space you have for modelling . It looks as if you are very handy with the tools as well. That is wonderful progress . I will look forward to seeing your trains run.
Jim.
mijj is online now   Reply With Quote
Old 24-03-2018, 10:41 PM   #25
RSR Engineer
Artur Gorote
 
RSR Engineer's Avatar
 

Join Date: Jan 2017
Location: Thannhausen, Germany
Posts: 35
RSR Engineer is on a distinguished road
Default Mainframe done

Thank you for your compliments, gentlemen. The mainframe is now complete and standing on all its legs. These have been cross-braced in many places to improve stability. All the gubbins that was stood about on top of the frame has been banished to the floor. There will be extra joists (as per the open frame concept) between the mainframe members and, in the area where the north sidings (dark green area) are to go, flush with these, to ensure adequate support for the board material (12mm OSB). See diagram.
Cheers
Artur
The work is documented in somewhat more detail in flickr:
https://www.flickr.com/photos/537755...57693670264075
Attached Images
File Type: jpg NL020x.jpg (313.2 KB, 22 views)
File Type: jpg NL022x.jpg (252.6 KB, 14 views)
File Type: jpg option11-01d20-mainframe+northloops.jpg (147.7 KB, 23 views)

Last edited by RSR Engineer; 24-03-2018 at 10:44 PM. Reason: URL
RSR Engineer is offline   Reply With Quote
Old 13-06-2018, 10:00 AM   #26
RSR Engineer
Artur Gorote
 
RSR Engineer's Avatar
 

Join Date: Jan 2017
Location: Thannhausen, Germany
Posts: 35
RSR Engineer is on a distinguished road
Default Boards marked out.

We are now ready to start cutting out the boards. All tracklines and board edges have been marked out by the grid reference method described earlier. In some places this needed three layers of board. Only at the "interfaces" to the old layout will the cutting be done empirically, i.e. by offering up and cutting to actual size, as opposed to what's in the diagrams.

Pix NL038 & NL039 show the top end of the northern approach with the northern station throat laid approximately in place. Pic NL041 shows the southern end. Pic NL047 shows the turntable with the estimated new line of the headshunt. Pic NL049 shows how the old layout fits into the overall scheme. This was just a temporary setup. The old layout boards will be finally mounted when all other baseboard construction work is complete.

The work is documented more fully on flickr: https://www.flickr.com/photos/537755...57693670264075
Attached Images
File Type: jpg NL038x.jpg (277.7 KB, 9 views)
File Type: jpg NL039x.jpg (365.1 KB, 11 views)
File Type: jpg NL041x.jpg (326.1 KB, 9 views)
File Type: jpg NL047x.jpg (331.1 KB, 15 views)
File Type: jpg NL049x.jpg (325.4 KB, 28 views)

Last edited by RSR Engineer; 13-06-2018 at 10:03 AM. Reason: Forgot URL.
RSR Engineer is offline   Reply With Quote
Old 13-06-2018, 12:25 PM   #27
Mr Bones
Privateer
 
Mr Bones's Avatar
 

Join Date: Apr 2016
Location: Canterbury
Posts: 878
Mr Bones is on a distinguished road
Default

That's all coming together nicely. It really is an impressively large layout. I'm sure I'm not alone in being very envious
__________________
The difference between stupidity and genius is that genius has its limits.
Mr Bones is online now   Reply With Quote
Old 14-06-2018, 02:17 PM   #28
RSR Engineer
Artur Gorote
 
RSR Engineer's Avatar
 

Join Date: Jan 2017
Location: Thannhausen, Germany
Posts: 35
RSR Engineer is on a distinguished road
Default

Thank you, Mr Bones. Love your aphorism. Nice one!
RSR Engineer is offline   Reply With Quote
Reply

Bookmarks



Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump



All times are GMT +1. The time now is 10:36 PM.


Powered by vBulletin® Version 3.8.3
Copyright ©2000 - 2018, Jelsoft Enterprises Ltd.