Model Railway Forum

Go Back   Model Railway Forum > Model Railway Construction > Track Layout & Design

Track Layout & Design Help with designing your track work


Reply
 
Thread Tools Display Modes
Old 05-08-2017, 08:57 AM   #321
Panniertank
Senior Member
 
Panniertank's Avatar
 

Join Date: Jul 2017
Location: Kidderminster
Posts: 131
Panniertank is on a distinguished road
Default

What an amazing layout and a fantastic thread! Love the video's, all that track and they run so smoothly! Excellent stuff
__________________
Oh Doctor Beeching, what have you done?
Panniertank is offline   Reply With Quote
Old 09-08-2017, 12:34 AM   #322
RSR Engineer
Artur Gorote
 
RSR Engineer's Avatar
 

Join Date: Jan 2017
Location: Thannhausen, Germany
Posts: 13
RSR Engineer is on a distinguished road
Default

Reading this thread for the 1st time. Very nice layout, Tinker. Just wanted to mention, on my old layout, all pins (actually cheap-o nails 1x12mm) were hammered in, as they will be on the new one (see thread). You have to hold the pin upright with slim-nosed pliers till it's entered, then use a drift to protect the track when you drive it home. Having said that, the boards were of 13mm chipboard, not ply, and I always drilled slightly oversize holes through the sleepers (a) to allow the track to float on the underlay (2.5mm foam plastic) and give under the weight of the train and (b) to give the pin room to be a bit wonky if I had to push the track to one side to get the alignment right. Hope this helps.
Cheers,
Artur
RSR Engineer is offline   Reply With Quote
Old 09-08-2017, 08:26 AM   #323
Tinker
Motive Power Supervisor
 

Join Date: Jan 2016
Location: N W Norfolk
Posts: 2,013
Tinker is on a distinguished road
Default

Well one of the benefits of ply Artur i think there Gaugemaster pins i used flat top type can be pushed in by the end of a finger and them knocked in with a pin hammer and punch, all my curvy track is pre-made Peco Cade 100 and comes with pre-drilled holes the straight bit are flexi-track which require drilling, no foam used the track goes straight on the ply and ballasting has begun on a small section to get the hang of it. Alignment of the straight track i have some 16mm hardwood strips that fit between the rails and help keep it straight.
Tinker is offline   Reply With Quote
Old 09-08-2017, 09:35 AM   #324
Walkingthedog
Wine depleter
 
Walkingthedog's Avatar
 

Join Date: Aug 2013
Location: HAZLEMERE, Bucks
Posts: 8,219
Walkingthedog is on a distinguished road
Default

Gaugemaster pins can be pushed all the way home with the end of some pliers, no hammer or drift required so no chance of damaging the track.
__________________
NURSE,the screens!
Walkingthedog is offline   Reply With Quote
Reply

Bookmarks



Currently Active Users Viewing This Thread: 1 (0 members and 1 guests)
 
Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump



All times are GMT +1. The time now is 10:15 AM.


Powered by vBulletin® Version 3.8.3
Copyright ©2000 - 2017, Jelsoft Enterprises Ltd.